Service 07
Concrete & Road Works
Pour, finish and pavement gangs for slabs, floors, kerbs, drains and roads.
Scope
What our crews handle
Concrete waits for no one. Our pour and finishing gangs are built around the batch — placing, vibrating, levelling and power-floating on the clock — and our road crews move with the chainage across PQC, DLC, kerbs, drains and bituminous layers. Curing is scheduled, not hoped for.
- RCC slab, raft and pavement pours — placing, vibration, screeding and curing
- VDF / trimix industrial floors with power-float and trowel finishing to flatness spec
- Pavement quality concrete (PQC) and dry lean concrete (DLC) laying with fixed-form or paver support
- Kerb, channel, median and drain casting — in-situ and slip-form assistance
- Bituminous paving support — DBM/BC crews for paver, roller and joint work
- GSB and WMM base laying and compaction assistance
- Box culverts, pipe culverts, retaining walls and crash-barrier casting
- Precast elements — drain covers, kerb stones, boundary panels
- Saw cutting of contraction joints, joint sealing and surface texturing
Crew
Workforce you get
Concrete masons and finishers
Screed, float, trowel, texture
Power-float and screed operators
Industrial floor flatness
Paver and roller support crew
Bituminous and concrete pavements
Bar benders
Pavement dowels and slab reinforcement
Helpers
Placing, curing, joint sealing
Works supervisor
Included on crews of 12+
Fit
Where this fits
- Infrastructure & RoadsHighways, urban roads, drains, culverts, bridges and utility corridors.
- Warehousing & LogisticsPEB sheds, VDF flooring, racking installation, dock and yard works.
- Industrial Plants & FactoriesShutdowns, capacity expansions, structural fabrication and plant maintenance crews.
- Construction & Real EstateResidential towers, villas, commercial blocks and township work at every stage of build.
FAQ
Good to know
Yes. Road and infrastructure crews are used to camp living. We mobilise from the nearest hub, you provide accommodation and transport on the alignment, and our supervisor manages rotation.
Yes — VDF/trimix crews with power-float experience on Grade-A warehouse floors, working to the FM/TR34 flatness tolerances your consultant specifies.
Also
Related services
08
Electrical Works (Single & Three-Phase)
Electricians and helpers for wiring, panels, cable trays and earthing.
View details09
General Labour Supply
Verified helpers, loaders and site labour, deployed at any headcount.
View details01
Civil Works
Masonry, shuttering, rebar and structural crews for every stage of build.
View details
Ready when you are
Need a crew on site this week?
Tell us the trade, headcount and location. We confirm availability and deploy in 24–72 hours.